01
Date first
We start with your inspection, handover or opening day and the trades still on site.
Post-construction cleaning
Give us the day the space must be ready. We walk the site, plan every pass backward from it and leave rooms ready for the people who sign off.
Get a quoteCall (408) 637-4921

The last days of a build leave a fine layer of drywall dust on every ledge, adhesive on the glass, labels on the fixtures and grit in every track. Post-construction cleaning removes all of it, top to bottom, so the finishes your trades installed look the way the architect drew them. We start with the date on your schedule and work backward, deciding which areas get cleaned first, which wait for the last trade and when the final detail pass happens.
Our crews dust high ledges, vents, light fixtures and door frames, wipe cabinets inside and out, clean glass and mirrors, scrub restrooms and break rooms, remove film and stickers, and vacuum and mop every floor. Debris and packaging leave with us or go to the site’s bins, whichever your superintendent prefers. Each area is checked by a supervisor before we mark it done, so the space is ready for inspection photos, the owner walk and the first day of use.
Paperwork matters on a jobsite. Swift is insured, bonded and carries workers’ compensation, and a certificate of insurance is ready for the GC’s file before the first visit. Crews are background-checked and follow site rules and PPE requirements. We schedule around the trades and the client’s hours, evenings and weekends included, so cleaning fits between the other crews rather than stopping them. One contact holds the plan from the first visit to the final walk.
Step by step
01
We start with your inspection, handover or opening day and the trades still on site.
02
Each visit goes on the calendar backward from that day, with nights and weekends where they fit.
03
A supervisor checks every room before your walkthrough, so nothing waits for a second trip.
A few useful answers
After the dusty trades finish in an area, and early enough to leave a detail pass before your date. The walkthrough sets that order, so drywall sanding and ceiling work are behind us before glass and fixtures get their final polish.
Yes, loose debris, packaging and cleaning waste. We bag it and take it to the site’s dumpster or haul it away, whichever suits the way your site handles waste.
Yes. Crews arrive with vacuums, ladders, cleaning chemicals and supplies, so all you provide is access, power and water.
Square footage, how many visits fit before your date, the dust and residue left behind, glass and fixture counts, and whether the work runs at night or on weekends. We walk the site at no charge and follow up with a price in writing.
More services
01 / Short notice
A crew lined up quickly when the walkthrough moves up or another cleaner drops out.
View details02 / Inspection day
Spaces cleaned and cleared before building, health or occupancy inspections.
View details03 / Touch-ups
Quick return visits after punch repairs so last-minute dust never reaches the walkthrough.
View detailsIndustries
01 / Opening-day projects
Exam rooms, procedure rooms and waiting areas cleaned and disinfected before the first patient.
View details02 / Opening-day projects
Classrooms, corridors, gyms and common areas cleaned for the first day of the term.
View details03 / Move-in and closing projects
Tenant improvements and new office floors cleaned before furniture, IT and move-in day.
View detailsResources