01 / On your date
Post-construction cleaning
Construction cleanup planned backward from the day the space has to be ready.
View detailsConstruction cleaning in Vallejo
Converted waterfront buildings, new medical suites and apartment lease-ups in Vallejo all face an inspection and a move-in date. Swift plans the cleanup from those dates and works around the trades.
Get a quoteCall (408) 637-4921

We clean commercial and residential projects throughout Vallejo, from downtown and the waterfront to Mare Island and the I-80 corridor. Mare Island’s industrial and waterfront buildings see conversions to offices, workshops and event space, and those jobs leave more than ordinary drywall dust behind: grit in window frames, residue on concrete floors and debris on high ledges. The walkthrough scopes all of it against the date of the occupancy inspection.
Medical offices near the I-80 corridor and downtown Vallejo are cleaned for the inspector and then for patients, with exam rooms, counters, cabinetry and restrooms detailed and dust cleared from vents and ceiling grilles. Office build-outs get the same planning around the tenant’s move-in, and when punch list repairs bring painters or electricians back, a crew follows them so the walkthrough sees finished rooms.
Apartment lease-ups in Vallejo run on unit-by-unit move-in dates. Each finished unit is cleaned, inspected and released to the leasing team, while the lobby, corridors and fitness room are ready before the first tour. Crews are background-checked, Swift carries insurance and a bond, and a certificate of insurance goes to the owner or general contractor before work begins. Supervisors keep a running list of released units so the leasing office always knows what is ready to show.
Our services
01 / On your date
Construction cleanup planned backward from the day the space has to be ready.
View details02 / Inspection day
Spaces cleaned and cleared before building, health or occupancy inspections.
View details03 / Touch-ups
Quick return visits after punch repairs so last-minute dust never reaches the walkthrough.
View detailsIndustries
A few useful answers
Yes. Conversions on Mare Island are scoped at the walkthrough, including high ledges, concrete floors, window frames and the restrooms and kitchens added in the build-out. The plan is set from your inspection or opening date and written into the quote.
Yes. Units are cleaned and released in the order the builder finishes them, so the leasing team shows and leases each one on its own date. Common areas are handled on their own schedule ahead of the first tours.
We send a crew back after the repairs to clear the fresh dust, drips and fingerprints, and the supervisor rechecks the rooms. Your owner walkthrough sees the finished space, not the touch-up work.